188体育

Ayala Corp. managing director and head of the conglomerate鈥檚 energy investments Eric Francia said AC Energy Holdings Inc., the group鈥檚 holding company for its investments in the power sector, is in talks with potential partners for power projects in Mindanao. "We鈥檙e in very advanced stages of development work there. Unfortunately. I cannot disclose at this point but we do have advanced projects in Mindanao,鈥� Francia said. The strategy, he said, is to partner with existing players. "Let me put it this way. We will not reinvent the wheel... It鈥檚 too late in the game to start from scratch,鈥� he said. However, in the long term, AC Energy is also eyeing to have its own projects. "Since we are here for the long haul, we鈥檒l be originating projects ourselves as we get better at development work but that will probably come online seven to 10 years from now. Right now we鈥檙e talking about projects on the first five years of our existence, we want to partner with people who have done advanced works already and enable that project to take it to the finish line,鈥� Francia said. At present, Mindanao is suffering from seven- to eight-hour power failure and even 10 hours in some areas. Government think-tank Philippine Institute for Development Studies (188体育), in a study by senior research fellow Adoracion Navarro, has warned that the Mindanao power crisis of 2012 may stage a comeback in this year鈥檚 and next year鈥檚 summer season given that there had been no additions to the baseload capacity. "The demand for power in Mindanao has continuously spiked through the years with rapid urbanization and increased industrialization,鈥� 188体育 said. According to Navarro鈥檚 study, consolidated forecasts for the electricity demand for the period of 2010-2019 show an annual average demand growth of 4.28 percent in Mindanao, which is higher than national rate of 3.63 percent in the same period,鈥� 188体育 said. Citing 2012 data from the Energy department, the 188体育 study said the Mindanao grid at present has 37.31 percent baseload generating capacity, a far cry from Luzon鈥檚 63.94 percent and Visayas鈥� 71.88 percent. "Mindanao鈥檚 generating capacity is also heavily dependent on hydropower which has become unreliable in the face of worsening deforestation of watersheds and siltation of river systems,鈥� 188体育 also said.

Main Menu

Secondary Menu